Demolition
2023
Our client needed their new house prepped and ready for new floor and kitchen installation to begin. We helped move all their furniture to different areas of the house before demolition. We removed hardwood and tile from the entire main level, stairs, and two landings. Following the removal, we went over every inch to make sure every last nail and staple was removed. A final sweep was performed ensuring the house was left perfectly prepped for the installation to take place, so no time or energy would be wasted for the installers.